Dieser Browser wird von uns nicht unterstützt. Damit sie die Webseite in vollem Umfang nutzen können, laden Sie sich bitte einen aktuellen Browser herunter: https://browsehappy.com
Production according to the rules of the KTA

The Nuclear Commission (KTA) has defined rules for the planning as well as manufacturing and operation of nuclear facilities. We have been producing high-quality products made from different materials according to these sets of rules. The creation of production and inspection sequence plans, testing instructions or plans for periodic testing are as much a part of our daily routine as the complete documentation of all actions.

The execution of the requirements of the following sets of rules in theory and practice are part of our special experience:

  •   KTA 3902 – laying of hoisting devices in nuclear power plants
  •   KTA 3903 – testing and operation of hoisting devices in nuclear power plants
  •   KTA 3905 – load attachment point for loads in nuclear power plants

Including overload tests for hoisting devices or load attachment points with loads of more than 150,000kg.